Showing posts with label truck conversion. Show all posts
Showing posts with label truck conversion. Show all posts

October 5, 2007

The Crusher goes to Brighton

Our first journey:

So, the mobile office isn't done yet, but since we have all the major components for powering everything, we figured we'd take it out for a little mini-trip.

Destination: Brighton, Utah


We loaded up some make-shift desks, power strips, laptops, lawn chairs, snacks and of course, a bottle of wine to celebrate our first trip. We headed up the canyon where we picked up a hitchhiker. He was a schizophrenic guy named Tom. We gave him a lift up to his cabin.

We got up to Brighton. Luckily, the resort has wireless internet so we parked right up by the lodge. At this point we realized that the metal cage we were in very effectively blocked out all wireless internet access. We rearranged the desk situation so we were
closer to the window. Success. We set up shop and went to work. I've found I'm much more productive when I'm working from exciting places. We opened the back doors so we had a perfect view of the mountains. It was a little chilly, but we brought hoodies and blankets so it wasn't too bad.

This little trial run gave us a chance to see what was needed/needed to be fixed to effectively run our office. The internet thing will be an issue - especially once we get the wall up in the cab. Dave will run some sort of antenna on the roof so we can pick up a signal.
Everything went pretty well. We had a productive day and it gave us the motivation needed to get back to work on the truck.








October 4, 2007

Back in action

And we're back!

So now we've got all the necessary equipment for powering the mobile office. I'll have Dave go more into that later. Basically, we have 2 generators, a power inverter, 2 additional batteries and a battery charger.

Dave is working on setting up the door that separates the cab from the rest of the truck. It's a wooden wall with a sliding door. It will be well insulated to block out much of the truck's running noises.

Next on the to-do list: wiring.